A9 Gleinalmtunnel
2020-01-14 10:30
by Dürr Group GmbH

A9 Gleinalmtunnel

electro-mechanical equipment

 
Client: ASFiNAG BMG
Completion: 12/2019
Length: 8,291 m
8,320 m
Tubes: 2

Completion of the Gleinalmtunnel

The A9 Phyrn motorway is part of a 230 km long north-south transit axis between the crossroad Voralpenkreuz and Spielfeld on the border to Slovenia. It is thus an important north-south transversal, not only in Austria but also in the European transport network. The Gleinalmtunnel is situated between the motorway junction St. Michael and Deutschfeistritz and belongs to longest two-tube road tunnels in the world. DÜRR Austria was awarded with the contract in December 2015 and the traffic release of the A9 took place in December 2019 after a nearly three-year project period.

Project Features

7 UPS units
328 driveway tunnel lights
26 jet fans in tunnel driving space
163 exhaust air flaps
69 crossway fans
5 barrier systems
47 traffic signs 
65 LED-variable message signs
20 info displays 
348 escape route lights
237 AKUT microphones
150 emergency roadside telephones 
50 speakers & 58 amplifiers 
93 local control units & 213 switches 
195 km control cabling 
268 km fiber optic cables

0

low voltage distribution boards

0

LED-tunnel lights

0

LED-lane indicators

0

CCTV incl. video detection

0

system data points

0

km energy cabling

Go back

© 2025 DÜRR Group GmbH. All rights reserved.